
1GENIEGENIE™ CE APS CE APS14” Cord Electric All Purpose Automatic ScrubberE87977-001001 Brown Avenue • Toledo, Ohio 43607-0127 Customer Service: 88
10To properly turn off the machine after use or before maintenance:1. Turn off the solenoid valve switch. (3)2. Raise the squeegee with the squeegee
11WARNING: Always wear gloves to protect yourself from contact with hazardous chemicals.1. CLEANING THE RECOVERY TANKA. Disconnect the vacuum hoses.B
123. REPLACING THE SQUEEGEE BLADESExamine the condition of the squeegee blades. Replace as necessary. To replace the blades:A. Lift the squeegee.B.
131. CLEANING THE SQUEEGEE HOSECheck the squeegee hose for blockage if the suction is insuffi cient and at peri-odic intervals. To clean the hose:A. R
141. ELECTRICAL SYSTEM SAFETYThe machine is equipped with a thermal breaker unit that has a manual reset.The brushes motor is re-enabled by resetting
15POLYPROPYLENE BRUSHES (PPL)These are used on all types of fl oors and offer good wear resistance.PAD DRIVERSPad driver and an fl oor pad is recommende
16BRUSH DECK PARTS DIAGRAMA2223241582674283527313276161545141341422994313212373947a47b47c47d29173619 333432251110131615384020184443A
17BRUSH DECK PARTS LISTING 1 E86253 Clutch Flange 1 2 E20026 Bearing Shaft 1 3 E20503 Spacer 1 4 E20048 Belt Tensioning Arm 1 5 E88228
18SQUEEGEE SYSTEM PARTS DIAGRAM518718161511236417172129101112111413
19SQUEEGEE SYSTEM PARTS LISTING 1 E81815 Squeegee Vacuum Adapter 1 2 E81897 Bushing 3 3 E85792 Squeegee Shoe 1 4 E81753 Knob M5 6 5 E83
2TABLE OF CONTENTSRECEIVING THE MACHINE...3 - 4GENERAL SAFETY REGULATIONS ... 5MACH
20SQUEEGEE YOKE PARTS DIAGRAM311114105641569131282
21SQUEEGEE YOKE PARTS LISTING 1 E87971 Squeegee Yoke Arm 1 2 E86153 Squeegee Yoke 1 3 E82839 Squeegee Yoke Pivot 1 4 E86263 Oval Hd Phil
22MAIN FRAME PARTS DIAGRAM19520271813322826123837722348131110253417333023412976437 64239136240
23MAIN FRAME PARTS LISTING 1 E20604 Main Frame 1 2 E20235 Carriage Bolt M8x16 Zinc 4 3 E81539 Transport Wheel 200 OD x 42 W 2 4 E86255 F
24SOLUTION AND RECOVERY TANKS PARTS DIAGRAM312614201151320233225159130323118162728
25SOLUTION AND RECOVERY TANKS PARTS LISTING 1 E20490 Solution Tank 1 2 E20269 Latch Plate 1 3 E20193 Recovery Tank 1 5 E20268 Recovery Tan
26CONTROL HANDLE PARTS DIAGRAM122243422131263839373919202863254142524152318294932773329401718101163911
27CONTROL HANDLE PARTS LISTING 1 E81994 Support 1 2 E85770 High Hex Nut M6x13 Zinc 4 3 E20342 Soc Hd Cap Screw M6x40 Zinc 4 4 E81793 Sp
28ELECTRIC SYSTEM PARTS DIAGRAM1271110966613
29ELECTRIC SYSTEM PARTS LISTING 2 E83550 NyLoc Hex Nut, M6 Zinc 1 6 E85788 Electrical Housing 1 7 E85771 Electrical Cover 1 9 E88308 Ci
3Immediately check, when receiving the machine, that all the materials indicated on delivery documents have been received and also that the machine ha
30ELECTRICAL DIAGRAM
31ELECTRICAL LISTING 1 E20385 2 Way Rocker Switch ASM - Green 2 E20385 2 Way Rocker Switch ASM - Green 3 E20385 2 Way Rocker Switch ASM - Gre
32Remove the plug from the outlet before any inspection. The voltage and the frequency on the machine label must correspond with the voltage and frequ
33TROUBLE SHOOTING - VACUUM SYSTEM1. CHECK THE CLEANLINESS AND FUNCTIONALITY OF THE FIL-TER AND FLOATS.2. CONFIRM CORRECT POSITIONING AND THE FUNCTION
34TROUBLE SHOOTING - BRUSH BASE1. CHECK THAT THE BRUSH BASE SUPPORT ON THE RIGHT SIDE IS FREE TO MOVE INSIDE THE HOLE OF THE FRAME ARM.• This allows
35MAINTENANCE SCHEDULEGenie CERECOMMENDED SERVICE INTERVALS(HOURS)DAILY50 100 250 400 750 1,000ELECTRICCheck tightness of electric contacts and fuses0
3610 year coverageSubject to the conditions stated below, Betco warrants parts and labor on rotationally molded polyethylene tanks/housings and inject
4Rated power HP (W) 0.64 (480)Working width in (mm) 13.8 (350)Rear squeegee width in (mm) 17.3 (440)Work capacity ft2/h ( m2/h) 11,300 (1050)W
5The regulations below must be carefully followed in order to avoid harm to the operator and damage to the machine.• Read the labels on the machine c
61. HANDLING THE PACKED MACHINENo more than two boxes can be stacked.Total weight is 150 lb (70 kg).Overall dimensions are: A : 19.7 in (500 mm) B
74. SUPPLY POWER FOR THE MACHINEThe machine is supplied with a 50 foot (15.2 m) power cord.To power the machine, you must: A. Plug the power cord int
87. RECOVERY TANKA. Make sure that the recovery tank is properly mounted and that the hoses are properly installed onto the fi ttings that exit the re
91. MACHINE OPERATIONBefore operating the machine:A. Ensure all switches are in the off (“0”) position.B. Plug the power cord into a grounded wall o
Comentários a estes Manuais